Lodi Surface Water Treatment Facility Electrical Infrastructure Expansion

Completion Date
TBD

The proposed project is located at the Surface Water Treatment Facility at 2001 West Turner Road in Lodi, CA. The site consisted of site grading, compaction, and installation of crushed concrete base under the generators, installation of 25 pre-cast concrete equipment pads, and 4x poured concrete equipment pads. Minimal trenching as most of the electrical construction was above ground, except for 4x electrical duct bank feeders to 4x switchgears. Two walls and a chain link fence were installed.

Services Provided

  • Stormwater Management
  • QSD/QSP Services (CGP)
  • Regulatory Compliance Services
  • SWPPP Development (CGP)
  • Training
  • SMARTS Reporting
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.